MAKE : Design + Build
  • HOME
  • ABOUT US
  • PROJECTS
  • CONTACT
Select Page
Case Study House: 1.21: Continual Progress – Kids room lofts

Case Study House: 1.21: Continual Progress – Kids room lofts

by Makers1 | Jan 17, 2017 | BLOG, BUILD, Case Study House #1, PROJECTS

KIDS ROOM LOFTS! It’s been a little more than a year since we officially moved in – and we’re loving finding new ways to use and improve our space.  The open floor plan and tall ceilings give us some good opportunities.  I’ll highlight a few...
Case Study House: 1.20: A Year of Progress

Case Study House: 1.20: A Year of Progress

by Makers1 | Sep 14, 2015 | BUILD, Case Study House #1, PROJECTS

Well – this month marks the 1 year mark of breaking ground on this crazy family adventure, and we’re getting SO close to move-in. With the outside ALMOST 100% (needs another coat of paint…some tile on the front entry…a FUN door color, yet to be...
Case Study House: 1.19: moving INSIDE…tile work!

Case Study House: 1.19: moving INSIDE…tile work!

by Makers1 | Jul 23, 2015 | BUILD, Case Study House #1, PROJECTS

Slowly but surely this house is starting to feel like our home!   As overwhelming and frustrating as it can be to make all of these decisions…based on both what we like and what we can afford as well as what we can find available without special...
Case Study House: 1.18: Start of the Siding!

Case Study House: 1.18: Start of the Siding!

by Makers1 | May 26, 2015 | BUILD, Case Study House #1, PROJECTS

Another good productive week at our place.  Day One of siding had a pretty serious learning curve associated with it!  Between figuring out the “furring strips” (behind the big sheets of siding, we put strips of 1/2 ” pressure treated...
Case Study House #1.17: Insulation & Drywall

Case Study House #1.17: Insulation & Drywall

by Makers1 | May 19, 2015 | BUILD, Case Study House #1, PROJECTS

One of those steps that really makes a project feel like it’s coming together is drywall!   This was another example of the value of getting multiple bids!  One bid for insulation and drywall came in at over $30,000.  The price we ended up with...
Case Study House #1.16:  We Have a Driveway

Case Study House #1.16:  We Have a Driveway

by Makers1 | May 6, 2015 | BUILD, Case Study House #1, PROJECTS

Yesterday was one of those days where progress was made all over!      Our excavator, Rusty, did our final grading and spread out our base gravel for our driveway We passed our insulation and mechanical system inspections We finished all of the final...
« Older Entries

Recent Posts

  • Current Work – update 12/2017
  • Case Study House: 1.21: Continual Progress – Kids room lofts
  • SEASONS GREETINGS! Bywater’s 2015 Christmas Video
  • Case Study House: 1.20: A Year of Progress
  • Case Study House: 1.19: moving INSIDE…tile work!

Recent Comments

    Archives

    • December 2017
    • January 2017
    • January 2016
    • September 2015
    • July 2015
    • May 2015
    • December 2014
    • November 2014
    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014

    Categories

    • Architecture
    • BLOG
    • BUILD
    • Case Study House #1
    • DESIGN
    • Process
    • PROJECTS
    • Uncategorized

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    MAKE DESIGN + BUILD ©2020