CASE STUDY HOUSE #1.07:  Final Design

CASE STUDY HOUSE #1.07: Final Design

by Makers1 | Aug 25, 2014 | Case Study House #1, DESIGN, Process, PROJECTS

Perspective straight from the Revit construction model.  I want to do a “prettier” one showing materials, etc…hopefully coming soon! Stats: 1st flr: 1290 sf 1 full bath mudroom/pantry kitchen living room kids homework area (could be dining room for...
CASE STUDY HOUSE #1.06:  Permits

CASE STUDY HOUSE #1.06: Permits

by Makers1 | Jul 25, 2014 | Case Study House #1, Process, PROJECTS

This house has definitely been a learning experience already.  The permit process has been a major eye opener!  Here’s the approx. timeline of how it played out: 2/20 – began septic permit approval by the Health Dept. (we had to have the official approval...
CASE STUDY HOUSE #1.05:  Schematic Design

CASE STUDY HOUSE #1.05: Schematic Design

by Makers1 | Jul 23, 2014 | Case Study House #1, DESIGN, Process, PROJECTS

Schematic Design is the chance to establish the general scope, conceptual design, scale and relationships among the various pieces of the project. The primary objective is to arrive at a clearly defined, feasible concept while exploring the most promising alternative...
CASE STUDY HOUSE #1.04:  Concept Study Using Sketchup

CASE STUDY HOUSE #1.04: Concept Study Using Sketchup

by Makers1 | Jun 9, 2014 | Case Study House #1, DESIGN, Process, PROJECTS

After playing around with the floor plan and the site layout, I decided to push it a little further and see what it looks/feels like in 3d.  I have been a long time SKETCHUP user, when describing it to people – I usually say it’s a 3d program where you...
CASE STUDY HOUSE #1.03:  Concept Studies

CASE STUDY HOUSE #1.03: Concept Studies

by Makers1 | Jun 9, 2014 | Case Study House #1, DESIGN, Process, PROJECTS

Part of our contract on the land gave us a 15 day “STUDY” period. Allowed us to look into things like the septic system, make sure we had a correct survey, check on things like the HOA restrictions (which luckily there aren’t any!), etc…It also...
CASE STUDY HOUSE #1.02: The Site

CASE STUDY HOUSE #1.02: The Site

by Makers1 | May 8, 2014 | Case Study House #1, DESIGN, Process, PROJECTS

STATS: 23,678 SF lot  (one acre is 43,560sf) R1-C Zoning Setbacks:  Front: 30′ / Side: 12’min – 40′ total / Rear: 25′ The grading of the site will work out to have a 2 story house with a walk-out basement. The pink is approximately our...

Recent Posts

  • Current Work – update 12/2017
  • Case Study House: 1.21: Continual Progress – Kids room lofts
  • SEASONS GREETINGS! Bywater’s 2015 Christmas Video
  • Case Study House: 1.20: A Year of Progress
  • Case Study House: 1.19: moving INSIDE…tile work!

Recent Comments

    Archives

    • December 2017
    • January 2017
    • January 2016
    • September 2015
    • July 2015
    • May 2015
    • December 2014
    • November 2014
    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014

    Categories

    • Architecture
    • BLOG
    • BUILD
    • Case Study House #1
    • DESIGN
    • Process
    • PROJECTS
    • Uncategorized

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    MAKE DESIGN + BUILD ©2020